Holden’s Bottling Plant

We recently completed a technical fit of an 8.7-metre sectional overhead door manufactured by OSA Door Parts.

This is one of two specialist installations, where our fitters had to drill through the steel roof joist to securely fit the spring beam.This precision work enables our customer to unload articulated lorries directly inside their building, enhancing efficiency and streamlining operations.

The personal door, supplied by Robust UK Ltd, was also expertly installed by Doors For Industry (DFI) – a great collaboration resulting in a seamless finish 👏